Owning an Older Commercial Building in Ontario: What O. Reg. 278/05 Requires of Owners on Asbestos
The regulation does not start with a renovation. It starts with a record that has to sit in the building, and with the people who are entitled to see parts of it.
When does an Ontario building owner have to keep an asbestos record?
As soon as you know or ought reasonably to know that asbestos-containing material (material with 0.5 per cent or more asbestos by dry weight) was used in the building, O. Reg. 278/05 s.8 requires you to prepare a record, keep it on the premises, and update it at least once in each 12-month period. The same duty also switches on if you choose to treat material as asbestos, or if a worker or contractor reports a suspect find to you.
Source: O. Reg. 278/05 (Designated Substance — Asbestos on Construction Projects and in Buildings and Repair Operations), ss. 1(1), 8(2), 8(3)(a) and 8(5), Ontario e-Laws consolidation from July 1, 2026
I’m Arthur Zhao, a real estate Broker in Toronto. Here is a question worth answering before reading further: if someone asked you today to produce the asbestos record for your building, could you hand it over? Not a consultant’s survey sitting in an email folder, and not a binder at your accountant’s office, but a record kept on the premises, listing where the material is and what condition it is in.
For owners of older multi-tenant commercial buildings in Ontario, that record is the hinge of O. Reg. 278/05. Almost every other owner duty in the regulation either feeds into it or is triggered by it: who receives written notice, what you tell your own staff, what a constructor receives before bidding on work. This article walks through the record first, then the people attached to it, then the deadlines, and only then the question of which buildings are caught. It is a reading of the regulation’s text, not legal advice.
→
→
→
→
The record itself: what has to be written down
According to O. Reg. 278/05 (2026 consolidation), s.8(3)(a) requires the owner to prepare and keep on the premises a record once any of the five conditions in s.8(2) applies:
- (a) you treat material used in the building, such as insulation, fireproofing or ceiling tiles, as if it were asbestos-containing material;
- (b) an employer working in your building has advised you, under s.9, that its workers found material that may contain asbestos;
- (c) you know or ought reasonably to know that asbestos-containing material was used in the building for a building-related purpose;
- (d) an examination under s.8(8) or s.10 establishes, or would have established if carried out as required, that it was used;
- (e) a constructor or employer advises you under s.10(8) of a suspect find that was not in your pre-work report.
Section 8(4) then fixes the contents. The record has three required elements:
- Location of all the material caught by those five conditions;
- For each location, whether the material is
friableor non-friable (friable means it can be crumbled, pulverized or powdered by hand pressure when dry, or already is); - For friable sprayed-on material, either the type of asbestos if the material is known to be asbestos-containing and the type is known, or a statement that it will be treated as containing a type of asbestos other than chrysotile.
Two practical points follow from the wording. First, the record covers material you are only treating as asbestos, not just material a lab has confirmed. Second, the record is not a one-time document: s.8(3)(f) also requires you to inspect the listed material at reasonable intervals to determine its condition, and the regulation does not define how long a reasonable interval is.
ℹ️What counts as asbestos-containing material. Under s.1(1), it is material that contains 0.5 per cent or more asbestos by dry weight. Below that threshold, material is not asbestos-containing material in the regulation’s sense. Until material is tested, the regulation lets you choose to treat it as if it were, and several duties (s.8(2)(a), s.10(3)(b)) are written to accommodate that choice. Under s.3(4), once one bulk sample from an area of uniform material tests at or above 0.5 per cent, the whole area is deemed asbestos-containing.
Who must be told what
The record has an audience. Section 8(3) and section 10 name four kinds of people, and each one is entitled to something different.
Your tenants and other occupiers: written notice for their own area
Under s.8(3)(b), the owner must give any other person who is an occupier of the building written notice of the information in the record that relates to the area that person occupies. The regulation defines occupier by reference to the Occupiers’ Liability Act; in a multi-tenant building, the tenants in each unit are the most obvious people this clause points at.
Two follow-on rules matter in a leased building. If an update changes the record, s.8(6) applies the notice duty again with necessary modifications, so a changed entry means a fresh notice. And under s.8(7), an occupier who receives the notice becomes responsible for advising and training its own workers in the way s.8(3)(d) and (e) describe. Your notice is what moves that duty onto the tenant-employer.
An employer you bring in for work other than demolition, alteration or repair
Section 8(3)(c) covers employers you arrange or contract with for work that is not described in s.10(1)(a), which is the demolition, alteration or repair category. Section 2(1)(b) lists maintenance alongside repair and alteration, so maintenance-type work is where this clause appears to bite. If that work may involve material in the record, or may be carried on close to it and disturb it, the employer gets written notice of the information in the record.
Your own workers: information and a training program
If you employ people who work in the building, such as a superintendent or a maintenance crew, s.8(3)(d) requires you to advise them of the information in the record where their work may involve the material or may disturb it nearby. Section 8(3)(e) adds a training and instruction program covering four subjects:
- the hazards of asbestos exposure;
- use, care and disposal of protective equipment and clothing;
- personal hygiene during the work;
- the measures and procedures the regulation prescribes.
Both clauses are framed around workers employed by the owner. An owner that outsources all building operations reads these two clauses differently from one with staff on payroll; see the last section.
The prospective constructor: the complete report, before the work
Section 10 is the pre-work rule. Before you request tenders for demolition, alteration or repair, or arrange or contract for that work without tendering, you must have material that is likely to be disturbed examined under s.3, unless s.10(3) applies (you already know whether it is asbestos-containing, with the asbestos type for sprayed-on friable material, or the work is being arranged as though it were asbestos-containing). Whether or not an examination was needed, s.10(4) requires a report stating whether the material is asbestos-containing or is to be treated as such, describing its condition and friability, and including drawings, plans and specifications showing where it is.
That report then moves down the chain: under s.10(5) the owner gives any prospective constructor a copy of the complete report, and s.10(6) extends the same handoff from constructor to prospective contractor and from contractor to prospective subcontractor.
According to the Occupational Health and Safety Act (s.30), this sits on top of a broader rule for every designated substance: before a project begins, the owner must determine whether designated substances are present and list them, include the list with any tender, and make sure a prospective constructor receives it before a binding contract. Section 30(5) makes an owner who fails to comply liable to the constructor, contractors and subcontractors for loss or damages from a later discovery of a designated substance the owner ought reasonably to have known of. O. Reg. 278/05 s.10 is the asbestos-specific detail of that general duty.
⚠️A summary is not the report. Section 10(5) requires the owner to give any prospective constructor a copy of the complete report prepared under s.10(4), including the drawings, plans and specifications showing where the material is. Sending a one-page excerpt or a verbal heads-up does not match the wording.
The clocks: when each duty comes due
The regulation runs on several different clocks, and they are easy to blur together:
- When a trigger is met: the record must exist. Section 8(2) has no year-of-construction test; the trigger is what you know, should know, treat as asbestos, or are told.
- At least once in each 12-month period: update the record (s.8(5)(a)).
- Whenever new information arrives: update the record (s.8(5)(b)), and re-notify if the record changed (s.8(6)).
- Before tenders are requested, or before work is arranged without tenders: examination where required, the s.10(4) report, and the complete copy to the prospective constructor.
- When fallen friable material is being disturbed: if it is readily apparent that friable fireproofing or acoustical or thermal insulation has fallen and is being disturbed so that exposure is likely, s.8(8) requires the owner to have it examined, and no further work involving it until that is established, unless the work proceeds as though it were asbestos-containing (s.8(9)). If it is, or is treated as such, s.8(10) requires clean-up and removal of the fallen material and, where more will keep falling, repair, sealing, removal or permanent enclosure. Section 8(11) carves out fallen material confined above a closed false ceiling that is not part of a return air plenum.
- When something unexpected turns up during work: under s.10(8) the constructor or employer must immediately notify, orally and in writing, a Ministry of Labour inspector, the owner, the contractor and the joint health and safety committee or representative. That notice is itself a s.8(2)(e) trigger for your record.
- After a Type 3 operation: within 24 hours of receiving clearance air testing results, the owner and employer post them at the workplace and, if the building has other workplaces, in a common area (s.18(8)); the owner keeps a copy for at least one year (s.18(9)).
💡 My personal view, not legal advice: the place an owner of a leased building is most likely to lose track of these duties is the tenant fit-out request. I would make the asbestos record and the s.10 report a standing part of the landlord-consent process. Before approving an alteration, check which areas the work touches against the record, settle in writing who commissions any examination and report and who hands the complete copy to the constructor, and require the tenant’s contractor to report any suspect find back to you so the record can be updated under s.8(5)(b). How that is written into a lease is a question for your lawyer; what I am suggesting is only that the record be checked every time, not just when someone remembers.
Whose buildings are covered
Section 2(1)(c) applies the regulation to every building in which material that may be asbestos-containing material has been used, and to the owner of that building. The only owner exemption is s.2(4), and it is narrow. It covers two kinds of owner: the owner of a private residence occupied by the owner or the owner’s family, and the owner of a residential building with no more than four dwelling units, one of which is occupied by the registered owner or the registered owner’s family.
A building leased out to commercial tenants fits neither description as worded. Note also that s.2(4) speaks only of the owner. Section 2(1)(b) separately names every employer and worker engaged in repair, alteration or maintenance of a building. My reading is that the exemption lifts the owner’s duties, not those of the contractors who work there.
Section 2(4) exempt owner vs owner of a multi-tenant commercial building
What the regulation leaves open
Some questions an owner will ask are not answered in the text. Here is how I read them, framed as conditions rather than conclusions:
- What you “ought reasonably to know.” Section 8(2)(c) uses that standard but does not define it, and the regulation sets no year of construction. If your building’s history, prior reports or visible materials point toward asbestos-containing material, it would be hard to argue you could not reasonably have known; the text itself does not draw that line.
- A tenant who runs its own fit-out. Section 10 places the pre-work duties on the “owner,” and O. Reg. 278/05 s.1 does not define that word. The Occupational Health and Safety Act s.1(1) says “owner” includes a tenant, lessee, or occupier of premises used or to be used as a workplace. The regulation does not say directly whether that definition governs s.10. If it does, a tenant arranging its own alteration could carry s.10 duties itself; either way, the information it would need starts in your s.8 record.
- An owner with no employees. Section 8(3)(d) and (e) are written around workers employed by the owner. The written notices to occupiers in (b) and to employers in (c) are not tied to having employees, so on the wording they still apply.
- A mixed-use building with four or fewer dwelling units. Section 2(4) refers to a “residential building.” Whether a building with ground-floor commercial units and a few apartments above is a residential building for this purpose, the text does not say. That is a question for a lawyer, not a guess.
- Who pays. The regulation assigns duties; it contains no provision on how an examination, report or repair is paid for between landlord and tenant. That is left to the lease.
Owner checklist under O. Reg. 278/05
Grouped by when each item comes due. Each line ties back to a section quoted above.
- ☐Locate the building’s asbestos record and confirm it is kept on the premises (s.8(3)(a)).
- ☐Check it lists every location, friable or non-friable for each, and the asbestos type or non-chrysotile statement for friable sprayed-on material (s.8(4)).
- ☐Confirm each occupier has written notice of the entries for its own area (s.8(3)(b)).
- ☐If you employ building staff, confirm they have been advised and that a training program exists (s.8(3)(d)–(e)).
- ☐File any clearance air testing results received in the past year (s.18(9)).
- ☐Update the record at least once in each 12-month period (s.8(5)(a)).
- ☐Use that update to record the condition inspection s.8(3)(f) requires at reasonable intervals; the regulation does not fix the interval.
- ☐Send fresh notices if the update changed the record (s.8(6)).
- ☐Have material likely to be disturbed examined, unless s.10(3) applies (s.10(2)).
- ☐Have a report prepared covering asbestos status, condition, friability and drawings (s.10(4)).
- ☐Give the prospective constructor a copy of the complete report (s.10(5)).
- ☐Prepare the OHSA s.30 list of designated substances and include it with any tender.
- ☐For maintenance-type work, give the employer written notice of the record (s.8(3)(c)).
- O. Reg. 278/05, Designated Substance — Asbestos on Construction Projects and in Buildings and Repair Operations, ss. 1, 2, 3, 8, 9, 10, 18 (consolidation from July 1, 2026; last amendment O. Reg. 115/26)
- Occupational Health and Safety Act, R.S.O. 1990, c. O.1, ss. 1(1) and 30 (consolidation from November 27, 2025)
Asbestos in Older Ontario Homes: Testing, Removal & Compliance →That Pebble-Like Attic Insulation May Contain Asbestos: Know Vermiculite (Zonolite) Before You Buy →Your Commercial Building Has Sat Vacant Too Long: Toronto’s Chapter 632 Duties vs. the Vacant Building Registry Model Elsewhere in Ontario →First-Time Renter Guide →
Frequently Asked Questions
What does an asbestos record for a commercial building have to contain?
Under O. Reg. 278/05 s.8(4), three things: the location of all material that is, or is being treated as, asbestos-containing; whether the material at each location is friable or non-friable; and, for friable sprayed-on material, either the known asbestos type or a statement that it will be treated as a type other than chrysotile. The record must be kept on the premises (s.8(3)(a)).
Do I have to remove asbestos from my building?
The owner sections of O. Reg. 278/05 do not order removal simply because asbestos-containing material is present. Removal comes in at specific points: s.8(10) requires fallen friable fireproofing or insulation to be cleaned up and, where more will keep falling, repaired, sealed, removed or permanently enclosed; and s.6(1) requires removal, to the extent practicable, before demolition of material that may be disturbed.
Do I have to tell my tenants about asbestos, and does it have to be in writing?
Yes, in writing. Section 8(3)(b) requires the owner to give each other occupier of the building written notice of the record information relating to the area that occupier uses, and s.8(6) requires notice again if an update changes the record. A tenant who receives that notice then takes on the duty to inform and train its own workers (s.8(7)).
What happens if a contractor finds material that isn’t in the asbestos report?
Under s.10(8), the constructor or employer must immediately notify, orally and in writing, a Ministry of Labour inspector, the owner, the contractor and the joint health and safety committee or representative. No work likely to disturb that material may continue until it is tested under s.3 or treated as asbestos-containing (s.10(10)), and the notice is a s.8(2)(e) trigger for the owner to update the record.