The Land Under Ontario’s Hydro Corridors: Who Owns It, Who Decides, and Where a Private Use Stands in Line

That open strip under the transmission towers is usually provincial land — not the utility’s, and not the neighbour’s. Ontario’s Provincial Secondary Land Use Program reads it in three layers: ownership, control, and priority. A private plan like parking or open storage has to clear all three.

Arthur Zhao · Broker · AZ Real Estate Partners · 2026-09-27
Quick Answer

Can a business license the land under a hydro corridor for something like a parking lot or open storage — and who actually controls that decision?

Yes, a private business or landowner can license corridor land for a use like a parking lot or open storage — but that land answers to three masters before it answers to you. The ground itself belongs to the Province of Ontario. Hydro One holds a statutory easement over it, so moving electricity always comes first. And a private use ranks below public uses in the program’s priority order, granted through the PSLUP — the Provincial Secondary Land Use Program, run jointly by Infrastructure Ontario and Hydro One — as a licence or easement, priced at market value, with no buildings permitted.

Source: Infrastructure Ontario, Provincial Secondary Land Use Program — program page and FAQ (infrastructureontario.ca), read 2026-09-27.

I’m Arthur Zhao, a Toronto real estate broker. Here is a fact that is easy to miss if you live or run a business beside a high-voltage transmission line: the strip of open grass under those steel towers is, in many cases, owned by the Government of Ontario — not by the utility whose wires cross it, and not by the neighbour whose lot backs onto it. That single ownership fact opens three separate questions, and they have to be answered in order: who owns the ground, who gets to decide what happens on it, and — if the answer to using it is yes — where a private plan like parking or storage stands in the line. The program that governs all of this reads the land in exactly those three layers, so that is how this walk-through is built.

Layer One: The Ground Belongs to the Province

When Ontario passed the Reliable Energy and Consumer Protection Act, it moved the land Hydro One had owned for its transmission system into provincial hands. According to Infrastructure Ontario, that transfer covered roughly 50,000 acres — but that is only about 22% of Hydro One’s transmission grid. Hydro One did not walk away: it kept a statutory easement over the transferred land, reserving its right to move electricity across it, and the towers and other structures on the corridor remain Hydro One’s property. The rest of the grid runs over land Hydro One never owned in the first place — it holds only an easement there — and that land is not part of this program. So the first thing to establish about any corridor is which kind it is: provincial corridor land inside the program, or private land carrying a Hydro One easement. The two lead to completely different conversations.

ℹ️Before anything else, confirm which land you are dealing with. If your parcel is provincial corridor land, the Provincial Secondary Land Use Program applies. If it is your own private land merely crossed by a Hydro One easement, that is a separate matter with its own rules — and this program is not the route.

Layer Two: Two Parties Decide, and Transmission Decides First

The provincial corridor land is administered jointly by Infrastructure Ontario and Hydro One, and either a public body or a private landowner may apply to use it. But the two players are not equals in the decision. Hydro One completes a technical clearance review of any proposal, and only if it gives that clearance does Infrastructure Ontario execute the actual agreement — typically a licence or an easement. Behind that sequence is one non-negotiable rule: transmission is always the primary use. Hydro One’s current and future transmission needs, along with its technical, operational and safety requirements, have to be satisfied before any other use is even considered. The utility clears the ground before the landlord signs the lease.

Layer Three: Where a Private Use Stands in the Queue

Once transmission needs are met, the program ranks everything else in a deliberate order. New linear public uses come first; provincial or inter-regional linear public uses outrank local ones; non-linear public infrastructure outranks private uses; and public recreation also sits ahead of private uses. Corridors that can carry several compatible uses at once are preferred. Two terms do a lot of work here: a linear use runs along the corridor (a road, a transit lane, a trail, a pipeline), while a non-linear use touches only part of it (a road crossing, commuter parking, a community garden, a ball field). Private uses — Infrastructure Ontario’s own examples include gas pipelines, parking lots, open storage and agriculture — are allowed, including on an interim basis, but they are the last category the program reaches. Even a short interim use of under a year still has to pass Hydro One’s technical review.

💡 The single most useful thing to carry away is this: a private use is not disfavoured by accident — it sits at the very bottom of a priority order the program lays out on purpose. Transmission is satisfied first, then public linear uses, then public infrastructure and recreation, and only then does a private plan get its turn — on land it does not own, under a use that ranks below every public one. Reading that queue correctly, before spending money on a proposal, is most of the work.

What That Position Costs — and What You Cannot Build

Standing last in line also shapes the price and the physical limits. According to Infrastructure Ontario, a private use is charged on the basis of market value, plus property taxes and application-related costs such as legal fees; a local public use is also assessed at market value. Public recreation is treated differently, on a cost-recovery basis — a nominal fee plus maintenance and 50% of the property tax — and a municipal park runs on a licence of $1 a year, with the municipality covering maintenance and half the property tax. It is worth clearing up one point plainly: corridor land for a private use is not offered at a discount — the rate is market value, and the pricing schedule is adjusted from time to time with the market. The hard physical limit is the same for everyone: buildings and structures are not permitted on the corridor. And unless a tenant takes on the job in its agreement, Hydro One remains responsible for maintaining the corridor land.

How the Conversation Actually Starts

The doorway is Hydro One’s real estate group. An enquiry to Real.Estate@HydroOne.com gets a Real Estate Coordinator assigned to the file, and the program’s FAQ line is 1-888-231-6657. From there the sequence is the one already described: Hydro One runs its technical review, and on clearance Infrastructure Ontario executes the agreement. How long that takes is not fixed — Infrastructure Ontario ties it to the complexity of the proposal rather than a set timeline. Because the agreement itself is a licence or easement with real obligations attached, the specific terms are worth taking to an Ontario real estate lawyer before signing.

⚠️This is general information about how the program is structured, not legal advice on any specific parcel or agreement. Whether a particular use is permitted, and on what terms, turns on Hydro One’s technical review and the wording of the agreement — take those to an Ontario real estate lawyer or a licensed paralegal.

Frequently Asked Questions

Q

How do I even find out whether the hydro corridor beside my property is part of this program?

A

Start by establishing who owns the corridor land. The program covers the roughly 50,000 acres of former Hydro One transmission land — about 22% of the grid — that the Province now holds. If instead your own land is simply crossed by a Hydro One easement, the program does not apply. Hydro One’s real estate group (Real.Estate@HydroOne.com, or 1-888-231-6657) can tell you which category a specific corridor falls into.

Q

If Infrastructure Ontario signs a licence for my parking lot, can Hydro One still shut it down later for transmission work?

A

Transmission is the primary use at all times. Any secondary use, private or public, sits underneath Hydro One’s statutory easement and its current and future transmission, technical, operational and safety requirements. A licence lets you use the land around that reality; it does not put your use ahead of it. How a particular licence handles that — notice, suspension or termination — is set by the agreement itself, so read those terms before you invest.

Q

Open storage is allowed but buildings are not — so where is the line?

A

Infrastructure Ontario is explicit that buildings and structures are not permitted anywhere on the corridor, while uses such as parking lots and open storage appear on its list of allowable private uses. Anything that reads as a structure is out; whether a specific installation crosses that line is decided by Hydro One’s technical review, so confirm your exact plan with them rather than assuming.

Q

A nearby town runs a park in the corridor for a dollar a year — can my business get terms like that?

A

No. That $1-a-year rate is a municipal park licence, where the municipality also covers maintenance and half the property tax; public recreation is priced on cost recovery, not at market. A private commercial use is assessed at market value, plus property taxes and application costs. The pricing tier follows the use’s place in the priority order, not the parcel.

Q

Who actually signs the agreement — Hydro One or Infrastructure Ontario — and who do I approach first?

A

You approach Hydro One first: its real estate group takes the enquiry and runs the technical review. If Hydro One issues technical clearance, Infrastructure Ontario is the party that executes the agreement — a licence or easement. The two organizations split the roles: Hydro One clears the use, Infrastructure Ontario signs it.


Discover more from GTA Real Estate Broker | Arthur Zhao

Subscribe to get the latest posts sent to your email.

Continue reading

相关文章Related articles

您好!想了解房产买卖、投资、贷款?随时问我。 点这里开聊 →
Arthur Zhao

AZ 房产 AI 顾问

Arthur Zhao · Real Estate Broker

选个话题快速开始
Powered by AZ Real Estate Partners · 对话用于改进服务